Ballintuim Ship's Logs - Weir Quay to Creran - 2002

Contents

Front Page

Family Contacts

Family History

Sailing

Ship's logs 2002 (September)

Maps

New Zealand

Photos

Walks

Weather


maintained by
Nigel Richardson
Last update
November 2026 signature

header Loch Aline to Creran moorings (passage chart) - Kathy & Nigel

Return to Sailing index or passages from Islay Loch Aline

Saturday 21st September - return to Loch Aline

Drive to Creran, leaving the car and accepting a lift on "Shansi" to Loch Aline with Tom & Janice
Recover the dinghy and row back to Ballintuim

Sunday 22nd September - Loch Aline anchorage

09.30 Sun & clouds, Motor to Lochaline quay, shop closed until 11.30
12.00 Depart Lochaline, Main + Genoa, NE 2/4
14.00 Anchor 8m in Bernera bay at south end of Lismore island, NE 5(6)
17.00 Weigh anchor, return round Bernera Island, head up Lynn of Morvern NE 4(5), motor
18.00 NE 4, motoring
Airds Bay 19.20 Drop anchor in Airds Bay, in 5m, dragging (weed). reset OK, getting dark,
Log 20.4 miles

Monday 23rd September - Airds Bay anchorage

am Lovely calm&sunny morning, take of Genoa (up mast), remove wind vane, dry out everything
13.50 Weigh anchor, calm/sun
15.20 Drop anchor in Port Ramsey after a brief visit to Sound of Shana
19.00 Short walk on Lismore island then take off mainsail

Creran

Tuesday 24th September - Port Ramsey anchorage, Lismore Island

08.00 Cloudless sky, N 1/0
12.35 Motor our of Port Ramsey on a pefect day
13.20 Anchor for lunch off Eilean Dubh
14.30 Motor across to Achnacroish, Lismore Island and walk down to Kilcheran
18.30 Motor up to Loch Creran and anchor off South Shian

Wednesday 25th September - South Shian anchorage, Creran

09.00 Weigh Anchor, W 2/3C, almost raining, motor up to Creran mooring at Barcaldine
am Change engine oil
pm Change coolant, rain/overcast

Thursday 26th September - Barcaldine, Creran

09.00 Hoist Ballintuim out and move to winter storage

Friday 27th September - ashore at Creran

Leave for drive home to Devon