Ballintuim Ship's Logs Scotland West coast - 2003
Cruise to the Outer Hebridies - Kathy & Nigel (+ Brian)
Return to Sailing
index or June cruise from Creran
Saturday 5th July - Hoe Beg anchorage
08.55 Weigh anchor, N 2/3, grey/overcast, poor visibility, motor
10.30 Drop anchor in Bays Loch, Berneray after paassage thru'/over rocks 6.5M ~hw
am & pm walks - flowers, swans, birds & bothies, Phone Brian - plant to meet at Loch Maddy
20.50 - 21.30 move to anchorage near ferry terminal for better protection from south, 6.8M, S 2
Log 7.6 miles
Sunday 6th July - Berneray causway anchorage
06.00 S 4, overcast, Noisey night due to anchoring on rocks!
07.00 S 4, rain, move further south (Loch nam Ban), shallow (1.8M) but sand/mud, seems good
10.10 SxE 6/5 rain
18.20 SSW 4/5,fair
Monday 7th July - Loch nam Ban (shallow but sand), North Uist
10.00 S 3/4, rain
12.50 Weigh anchor, S 4/5, rain, Genoa, passage across the sound dodging rocks, islands & birds
14.35 Pick up visitor mooring in Poll an Tigh Mhail, enter via harbour passage, just us in near perfect anchorage
19.00 Meal ashore ar very odd hotel, good steak pie but terrible modern paintings
Log 9.4 miles
Tuesday 8th July - Poll an Tigh Mhail anchorage, South Harris
11.20 Weigh anchor W3 showers, Main + Genoa, creep out via sea passage, 2.2M at 1/2 tide
12.00 ~ 1/2/3, motoring
13.45 Pick up mooring in Loch Maddy by the ferry terminal
22.00 Call from Brian in Boisdale - eta Wednesday at 11.05
Log 11.8 miles
Wednesday 9th July - Loch Maddy visitors mooring
07.00 SSE 4/5 mist, visibility 200 yards!
11.30 Pick up Brian, drop mooring sail out with 3 reefs and reefed Genoa, heading ExN
12.30 SSE 4/5, visibility improving
13.30 SSE 3/4, shake out reefs
15.30 Approaching Hunish (north Skye)
16.00 Off h-Aiseig, SExS, beating
16.20 Heading for Staffin bay, motor
17.10 Anchor at east side of Staffin bay in 7M, SExE 4/5, dramatic mountain scenery
Log 33.3 miles
Thursday 10th July - Staffin bay, NE Skye
10.30 Weigh anchor, well reefed, close hauled making for Caol Rona, SW 4/5, gusty with showers
12.10 Approacjing Caol Rona
13.15 Sailing down the Inner Sound, wind up & down
14.05 S 5, motor/sail
14.20 S 5, drop main, give up, turn back to Pol Domhain
14.40 Anchor in Pol Domhain north of Crowlin islands
20.00 Anchorage seems quite sheltered at present
Log 22.6 miles
Friday 11th July - Poll Domhain anchorage, Ross
08.15 Motor out of anchorage, SSW 2, rain
08.25 SWxW 5/6, rain stopped, sailing well reefed
09.30 Approaching Kyle Akin
12.35 Anchor in bay on west side of Ornasy Isle harbour after motor sailing down Kyle Rhes & Sound of Sleat
17.15 Motor to quay and tie alongside, (1.7M at HW)
Log 22.8 miles
Saturday 12th July - Ornsay Isle quay
06.00 Move out to anchor in 5.5M, SW 3, overcast
08.15 Weigh Anchor, SW 4/5, showers, motor/sail
09.35 Very raw & bleak weather
10.33 SW 2/3, fair, weather calming down with hints of sunshine, motor/sail
11.40 SW 4, off entrance to Loch nan Ceal entrance
13.15 Anchor at SE end of North Loch Moidart, walk around the island, goats
Log 25.8 miles
Sunday 13th July - Loch Moidart
08.00 Weigh anchor, sail gently out of the loch
08.30 SE (4)/5/6, 3 reefs, reaching towards Ardnamurchan
09.30 Sun
10.30 Rounding Ardnamurchan
10.50 3 reefs + motor
11.20 SE 4 let out full Genoa, wind & sea reduced, beat towards Tobermory
12.55 Pick up mooring in Tobermory
Log 26 miles
Monday 14th July - Tobermory anchorage
08.35 Weigh anchor SE 4, overcast, motor (sail), 30.6 miles to mooring
09.35 Motoring down the Sound of Mull
10.35 Off loch Aline, SE 4
11.50 Beating up Loch Linnhe, NE 3, Sun
13.15 Anchor for lunch at Camus Eigneig, Morvern
14.30 Continue to Creran in hot sunshine, NE/SE 2
17.00 Pick up our Creran mooring
Log 33.4 miles, Total 342.8 miles in 18 daysDe
Tuesday 15th July - Creran mooring
08.00 Depart for home with Brian in his car